Gas pipeline
Yamal-Europe Pipeline
Russia (Yamal Peninsula) through Belarus and Poland to Germany. ~4,107 km.
Overview
Russia (Yamal Peninsula) through Belarus and Poland to Germany. ~4,107 km. Capacity ~33 bcm/yr. Commissioned 1999. Key northern transit route; flows reversed/halted amid Russia-Europe tensions post-2022.
Geopolitical context
Transits Belarus, tying Minsk's economy to Russian energy infrastructure and reinforcing the Russia-Belarus political union. Poland, despite being a transit state, has been one of the most aggressive EU members in seeking alternatives — commissioning the Baltic Pipe from Norway (2022) and expanding its LNG terminal at Świnoujście. Russia halted westward flows in 2022; Poland and Germany have since used the pipeline in reverse mode to distribute non-Russian gas. Demonstrates how pipeline infrastructure built for one geopolitical era can be repurposed when alliances shift.
Nearby
- Gazpromneft Moscow refinery (Kapotnya) Refinery · ~331 km
- Brotherhood Pipeline System Gas pipeline · ~505 km
- Druzhba Pipeline (Northern Branch) Oil pipeline · ~514 km
- Ust-Luga port (oil and products) Port / transit hub · ~639 km
- Primorsk oil terminal Port / transit hub · ~698 km
- Druzhba Pipeline (Southern Branch) Oil pipeline · ~955 km