Gas pipeline
Power of Siberia
Russia (Chayandinskoye/Kovyktinskoye fields) to China. ~3,000 km.
Overview
Russia (Chayandinskoye/Kovyktinskoye fields) to China. ~3,000 km. Capacity 38 bcm/yr at full ramp. Commissioned Dec 2019. 30-year supply contract between Gazprom and CNPC. Key vector in Russia's pivot to Asian markets.
Geopolitical context
Signed in 2014 after decades of failed negotiations — the deal crystallized only after Russia's annexation of Crimea made the "pivot to Asia" an urgent strategic necessity rather than a long-term aspiration. China negotiated from a position of strength, securing favorable pricing. The pipeline physically binds Russian gas infrastructure eastward and represents a structural reorientation of Russian energy exports. Power of Siberia 2 (via Mongolia) is under negotiation and would connect West Siberian fields to China, potentially replacing lost European volumes. Beijing sees the relationship as access to discounted energy; Moscow sees it as proof of alternatives to Western markets.
Nearby
- Daqing Oil field · ~398 km
- ESPO Pipeline (Eastern Siberia–Pacific Ocean) Oil pipeline · ~409 km
- Kozmino Bay (ESPO Terminal) Port / transit hub · ~436 km
- ESPO–China Spur (Skovorodino–Daqing) Oil pipeline · ~531 km
- Ulsan Refinery Refinery · ~1280 km
- Tianjin / Hebei Refining Hub Refinery · ~1378 km